Altigraphs
HC Ono, Japan

Amou-tōge

Western ascent from Shirakawa-go
Length
12.1 km
Height gain
802 m
Average
6.6%
Steepest km
10.5%
Summit altitude
1291 m
Difficulty
179

Elevation profile

489 m → 1291 m Touch or hover to inspect
0–4% 4–6% 6–8% 8–10% 10–14% 14%+
Steepest km: km 5 at 10.5%

Climb analysis

Where the climbing is

0–4%
2.3 km
4–6%
3.5 km
6–8%
2.4 km
8–10%
2.3 km
10–14%
1.8 km
14%+
0.0 km

Hardest sustained

1 km · km 4.0–5.0
10.5%
2 km · km 3.4–5.4
9.9%
5 km · km 2.4–7.4
8.4%

Time to the top

0h 57 at 3 W/kg · 70 kg rider + 8 kg bike, no wind

Kilometre by kilometre

Export CSV
Km Altitude Gradient 0–15%
1 549 m 5.9%
2 610 m 6.1%
3 677 m 6.7%
4 760 m 8.3%
5 866 m 10.5%
6 929 m 6.4%
7 1014 m 8.5%
8 1074 m 6.0%
9 1171 m 9.7%
10 1212 m 4.1%

Route map

Two fingers to pan
Road surface not mapped yet Report a road type
No tunnels mapped Map a tunnel

At the summit now

Updated 1 min ago
7° Clear Feels like 6° · 1291 m
Wind 2 km/h NW

How hard is 179?

Difficulty score is length × gradient, weighted for the steepest kilometre.

Help complete this climb

Riders’ photos, notes and corrections make every profile better.

Add a photo No photos yet — the last kilometre, the summit sign Write a rider note Traffic, water, where it really bites Map a tunnel Mark where the road goes underground Report a road type Not mapped yet — paved, unpaved or cobbles
Vote the best months to ride No votes yet
Nobody has voted yet Ridden this one? Tap the months you'd recommend to help other riders time it right.
Tap a month you'd recommend
Added by marcogf2901 · 1 contributor

Climbs nearby